Спасибо!

Мы исправим ошибку в ближайшее время

Сообщить об ошибке

Site Tools


Unit usage log

In the Omnicomm Online window, in the “Administration” section, open the “Vehicles” tab.

Select a vehicle and click “Unit usage log”. A window will open:

Unit usage log

To add a new unit, click the “Add” button.

“Date/time of vehicle connection” – enter the date and time when the unit was connected.

“Date/time of vehicle disconnection” – enter the date and time when the unit was shut down.

“Rated width of treated area, m” – specify the width of the area processed by the unit.

“Types of work” – select the type of work performed by the unit.

“Vehicle name” – specify the name of the unit.

Press the “Save” button.